
Investment Objective
Deliver a controlled value add flip on a prime, highly liquid asset in Downtown Dubai, converting two 2 bedroom units into turnkey product aligned with Burj Khalifa end buyer standards.
Target Outcomes
Key Constraints
This operation was designed as a controlled execution play on an iconic asset, prioritizing scope discipline, quality delivery, and a defensible exit thesis.
Execution Overview
Battimo managed the full value add program end to end on a buy side mandate, covering sourcing, renovation strategy, delivery control, and exit preparation across two 2 bedroom units in Burj Khalifa. The approach combined institutional underwriting discipline with practical on site execution to protect timeline and budget while achieving a prime grade finish.
Scope of Work
The priority was execution control: scope discipline, quality assurance, and documentation that supports a premium exit.
Key execution drivers
Net profit (AED) generated after total capex and DLD costs.
Exit value (AED) achieved across two fully renovated units.
ROI on total deployed capex over a 9 month execution cycle.

